Inova Fairfax Hospital Professional Services Building Fifth Floor

Falls Church, Virginia

Location

Falls Church, Virginia

Client

Inova Health System

Contract Value

Confidential 

Square Feet

35,000

Year Completed

2023

Schedule

48 weeks

Key Partners

Wilmot Sanz 

Project  Types

Healthcare
Renovations

Location

Falls Church, Virginia

Client

Inova Health System

Contract Value

Confidential 

Square Feet

35,000

Year Completed

2023

Schedule

48 weeks

Key Partners

Wilmot Sanz 

Project  Types

Healthcare
Renovations

Location

Falls Church, Virginia

Client

Inova Health System

Contract Value

Confidential 

Square Feet

35,000

Year Completed

2023

Schedule

48 weeks

Key Partners

Wilmot Sanz 

Project  Types

Healthcare
Renovations

Location

Falls Church, Virginia

Client

Inova Health System

Contract Value

Confidential 

Square Feet

35,000

Year Completed

2023

Schedule

48 weeks

Key Partners

Wilmot Sanz 

Project  Types

Healthcare
Renovations

Overview

Our team performed a comprehensive build-out of the entire fifth floor in the Professional Services Building, creating a state-of-the-art bronchoscopy and endoscopy suite, boasting nine procedure rooms. This expansion also encompassed the development of a fully equipped pre- and post-operative suite, featuring an impressive array of 26 patient bays strategically arranged alongside three nurse stations. The suite was meticulously designed to incorporate essential storage areas, supply rooms, and dedicated staff support spaces, alongside patient-centric amenities like a spacious waiting room, reception area, and inviting lobby. HITT delivered a calming new environment for patients and increased operational efficiency and flow for the staff to deliver world-class care.

 

Additionally, the project included two additional diagnostic rooms, along with dedicated spaces for scopes processing and cabinet storage, control rooms, and five specialized imaging facilities. To ensure seamless functionality, the team implemented robust infrastructure to support the suite's operation. This included the installation of exhaust fans, variable air volume (VAV) systems, computer room air conditioning (AC) units, and ductless split system AC units.

 

In addition to these enhancements, comprehensive electrical updates were carried out, involving the installation of new automatic transfer switches (ATS), uninterruptible power supplies (UPS), transformers, branch panels, and 18 isolation panels (two per procedure room). Our team faced challenges related to noise and vibration management, given the proximity of an active operating room suite on the floor below and a 24/7 adolescent psychiatric unit on the floor above. Despite these constraints, the team successfully navigated the complexities, ensuring the successful completion of the project.

Our Experts Our Experts Our Experts Our Experts

Key Team Members

Kevin Daniels

Vice President, Healthcare & Life Sciences

Washington, DC

Gary Stewart

Vice President, Business Development

Healthcare & Life Sciences

Washington, DC

Scott Decker

Vice President & Business Unit Leader

Healthcare & Life Sciences

Washington, DC

Chris Lukawski

Vice President, Healthcare & Life Sciences

Washington, DC