Special Project Two

Dulles, VA
Overview

This project represented the first phase of a 57-acre campus development, and included the construction of a 418,000-sf office building and tenant fit-out, including 370,000 sf of raised access floor area. The scope included a 34,000-sf central plant with 13.2-KV power substation, four 2.8 MW gensets day one (ultimately nine 2.8 MW gensets), two 2,500-kVA UPS day one (ultimately 20 MVA), a 5,000-ton chilling tower facility, and chilled water storage. 

Project Highlights
  • Achieved LEED Silver for office building
  • Achieved LEED Gold for Central Plant and Visitor Control Center